Engineering Standards & Specifications

The Engineering Division of Botetourt County's Public Works Department ensures compliance with county regulations concerning water and sanitary sewer mainline and system construction (EXCLUDING private water well or private drainfield systems).

For general commercial permitting information including forms, fees, procedures, and to schedule a pre-permitting advisory meeting, see the Permitting page.


Botetourt County Water and Sewer Construction Standards and Specifications

Revised 5/01/2009

Forms in this section are in PDF format.
In order to view PDF files, get the free Acrobat Reader software:
      • Water and Sewer Construction Standards and Specifications - PDF

Click HERE to view entire document, including text and details 
Recommend downloading only if using high-speed network connection (size = 11MB)

TABLE OF CONTENTS :
  1. INTRODUCTION / GENERAL RULES AND REGULATIONS
  2. DESIGN AND CONSTRUCTION STANDARDS FOR WATER FACILITIES
  3. DESIGN AND CONSTRUCTION STANDARDS FOR SANITARY SEWER
  4. BOTETOURT COUNTY PUMP STATION STANDARD
  5. WATER DETAIL DRAWINGS
  6. SEWER DETAIL DRAWINGS
  7. GENERAL DETAIL DRAWINGS
  8. APPENDIX

top


  • AutoCAD WATER Construction Detail Drawings - DWG

- Links in this section are to download files in .dwg format requiring AutoCAD 2007

- for views, see PDF section above

BC # TITLE
W-01 Single Residential Water Service
W-02 Single Residential Water Service with PRV
W-03 Double Residential Water Service
W-04 Double Residential Water Service with PRV
W-05 Standard Valve Box Installation
W-06 Valve Box Installation Trench Adapter
W-07 Permanent End of Line Blow-Off Assembly
W-08 Temporary End of Line Blow-Off Assembly (For Future Extension)
W-09 In-Line Blow-Off Assembly
W-10 Automatic Air/Vacuum Release Assembly
W-11 Automatic Air/Vacuum Release Assembly for Deep Water Lines
W-12 Fire Hydrant Assembly American Darling B-84-B
W-13 Thrust Block Construction
W-14 Thrust Restraint of Pipe Joints Design Lengths
W-15 Pipe Support in Casing Pipe
W-16 Leak Detection & Location Access Points for C909 PVCO Pipe
W-17 Commercial Water Service - < 2” Meter

top


  • AutoCAD SANITARY SEWER Construction Detail Drawings - DWG

- Links in this section are to download files in .dwg format requiring AutoCAD 2007

- for views, see PDF section above

BC # TITLE
SS-01 4’ Standard Manhole for Pipes 15” and Smaller
SS-02 Straddle Manhole for Pipes 15” and Smaller
SS-03 Mainline or Lateral Outside Drop Manhole (For Use with PVC Pipe)
SS-04 Mainline or Lateral Inside Drop Manhole (For Use with PVC Pipe)
SS-05 Watertight Manhole Frame
SS-06 Watertight Manhole Cover
SS-07 Commercial Sampling Structure (County Approval Required)
SS-08 Sanitary Sewer Lateral
SS-09 Sanitary Sewer Lateral for Deep Sewers
SS-10 Sanitary Sewer Lateral for Special Cases
SS-11 Combined 6” by Two 4” Laterals
SS-12 Private Force Main to Gravity Lateral Connection
SS-13 PVC – Force Main Cleanout
SS-14 Traffic Bearing Cleanout Box
SS-15 Concrete Encased Sewer Pipe
SS-16 Joining Dissimilar Pipe (Special Conditions Approved by County)
SS-17 Concrete Pier
SS-18 Anchor Block
SS-19 Road Crossing Detail - Pipe Support in Casing Pipe
SS-20 Type 1 Manhole Vent – Out of Right of Way
SS-21 Type 2 Manhole Vent
SS-22 Automatic Air/Vacuum Release Assembly for use on Force Main
SS-23 Sanitary Sewer Pipe Abandonment at a Manhole
SS-24 Sanitary Sewer Manhole Abandonment
SS-25 Fine Aggregate
SS-26 Air Testing Back Pressure Equivalency Table
SS-27 Air Testing Time for 1 PSI Drop
SS-28 Air Testing Time for 0.5 PSI Drop
SS-29 Deep Manhole w/Safety Slab - >15’ Depth
SS-30 Inside Forcemain Connection to Manhole
SS-31 Manhole Invert Shaping
SS-32 Manhole Sizing Table

top


  • AutoCAD GENERAL Construction Detail Drawings - DWG

- Links in this section are to download files in .dwg format requiring AutoCAD 2007

- for views, see PDF section above

BC # TITLE
G-01 Stone Bedding for PVC Pipe
G-02 Bedding and Backfill Under Pavement
G-03 Public Sanitary Sewer and Waterline Easements
G-04 Chain Link Fence
G-05 Tracer Wire Installation for Non-Metallic Pipe

top